
Double-flanged triple-offset layout
Review both flange interfaces, installed length, sealing direction and disc envelope against the piping drawing.
Compare flanged butterfly valve configurations for industrial piping. Match both flange joints, installed length and disc clearance before choosing the seat or operator.
Request a quote

Review both flange interfaces, installed length, sealing direction and disc envelope against the piping drawing.

If the existing spool was designed for a wafer body, compare required installed length, bolting and disc clearance before offering a flanged replacement.
A double-flanged butterfly valve has a flange at each end of the body. Give the mating flange standard, size, class or PN designation, facing and bolt pattern for both ends. Check the required face-to-face dimension against the actual spool length, especially if the old valve has a wafer or lug body. Request a dimensioned drawing of the proposed valve and gasket interfaces. If you are replacing a valve, include the old nameplate and both flange drawings where available so a change in pattern is visible before purchase.
Measure the real bore on each side, accounting for liners, weld transitions and nearby fittings. Ask for the disc envelope through its full rotation and superimpose it on the piping sketch. Confirm available space for gear operation, actuator removal and insulation. State process chemistry, design pressure-temperature cases and the maximum differential when the valve must close. A double-flanged layout describes the connection. Seat type, allowable differential and preferred sealing direction still need to be specified for the proposed model.
| Item | Send with your inquiry | Check on the offer |
|---|---|---|
| Connections | Interfaces at both ends, facing and bolting details | Dimensional drawing and installation interface |
| Disc clearance | Actual pipe ID and adjacent liner or fitting dimensions | Full disc envelope and clearance needed at both ends |
| Seating | Pressure-temperature cases, shutoff direction and leakage | Seat materials, allowable differential and seat test scope |
| Operation | Supply, stroke time, operating clearance and maintenance plan | Operator drawing, sizing basis and included accessories |
Send Val-Man the spool sketch and process datasheet together. If installation dimensions are fixed, mark the available space and bore on the sketch. Ask for dimensional and operating exceptions by tag so the team can compare the proposed valve and assembly scope before ordering.
Review the selection question and confirm the offered drawing, materials and requirements with your inquiry team.
Check the offered design against the existing spool and mating flanges. Confirm face-to-face length, bolt arrangement, gasket faces and disc clearance at both ends. Include the operator envelope and flange assembly access. Use the approved dimensional drawing to confirm the replacement fit before the purchase order.
Flange class identifies a pressure-rating designation for the connection under the applicable basis. Shutoff differential is the pressure difference the closed disc and seat must hold. Include both operating temperature and pressure-side direction, then verify the proposed assembly's rating and leakage limits.
Provide the actual inside diameter and the liner or fitting profile at each end. Apply the offered disc envelope through full rotation to the installation sketch. Ask the supplier to highlight any minimum clear bore and required separation from nearby fittings.
Include supply voltage or available air pressure, required operation frequency, stroke time and response on loss of supply. Provide the maximum operating differential and full temperature range. Ask for the sizing basis and complete assembled drawing, including bracket, controls and service access.
Use the approved drawing to verify the drilling, facing and end dimensions at each side. If the project requires different interfaces, mark each on the spool sketch and request explicit confirmation. Confirm gasket and bolting requirements with the piping team as part of the joint review.
Send the required size, process duty, installation dimensions and quantity.